5 Walk-In and Curbless Shower Pros in Friday Harbor
Friday Harbor homeowners planning a walk-in or curbless shower can check 5 licensed pros here first. Every one is based in Friday Harbor according to a state license record, not a submission form.
Licenses checked · Washington State Department of Labor & Industries
19.7%of residents are 65 or older
How long Friday Harbor's walk-in shower pros have been at this
Friday Harbor's listings span from a 2011 license start date to more recent additions.
Median tenure across Friday Harbor's roster sits at 3.4 years.
About 20% have carried their license for 10 years or longer.
Ask any Friday Harbor contractor, regardless of tenure, to show photos of a walk-in or curbless job they've actually completed.
Walk-in shower pros based in Friday Harbor, WA
Listed A to Z by business name.
A+ Tile
Tile contractor
- License
- Tile, Ceramic, Mosaic, Natural And Mfg Stone · TILE*T*805JN
- Since
- 2020
- Expires
- Apr 16, 2028
- ZIP
- 98250
CK Tile & Stone LLC
Tile contractor
- License
- Tile, Ceramic, Mosaic, Natural And Mfg Stone · CKTILTS750MZ
- Since
- 2025
- Expires
- Jul 9, 2027
- ZIP
- 98250
Gridworks Tile CO
Tile contractor
- License
- Tile, Ceramic, Mosaic, Natural And Mfg Stone · GRIDWTC897DJ
- Since
- 2011
- Expires
- Mar 12, 2027
- ZIP
- 98250
McGriff Masonry & Tile
Tile contractor
- License
- Tile, Ceramic, Mosaic, Natural And Mfg Stone · MCGRIMT774KZ
- Since
- 2023
- Expires
- Dec 26, 2027
- ZIP
- 98250
MJ Shower And Tile LLC
Shower specialist
- License
- Tile, Ceramic, Mosaic, Natural And Mfg Stone · MJSHOST759B9
- Since
- 2025
- Expires
- Jan 29, 2027
- ZIP
- 98250
Before you commit to a layout
- What are the exact interior dimensions of the shower once tile is on, not the framed opening before it?
- If it's curbless, how much will the subfloor be recessed, and does that affect the joists?
- If it's doorless, how much depth is planned to contain spray, and where does water exit toward the drain?
- Is the drain a point drain or a linear drain, and does that change the recess or slope plan?
- If glass is involved, is it framed or frameless, and is it tempered to meet the safety-glazing rule?
- Will grab bar blocking go in now even if a bar isn't mounted immediately?