Walk-In Shower Pros in Westminster, CA
Westminster, CA has 8 tile and shower pros carrying an active state license right now. Read our sizing and curbless-construction guides before you sit down with any of them.
Licenses checked · California Contractors State License Board
19.3%of residents are 65 or older
How long Westminster's walk-in shower pros have been at this
Westminster's earliest active listing on this page holds a license dating to 1997.
The typical Westminster listing has held that license for 18 years.
75% have kept the same license number for a decade or more.
Curbless framing rewards experience, since a bad slope or a mis-set recess isn't obvious until the tile is already down, so tenure in Westminster is worth a look.
8 shower and tile contractors based in Westminster
Listed A to Z by business name.
Affordable Elegance Tile Installation
Tile contractor
- License
- C-54 Tile · 897207
- Since
- 2007
- Expires
- May 31, 2027
- ZIP
- 92683
David & David Flooring INC
Tile contractor
- License
- C-54 Tile · 968836
- Since
- 2011
- Expires
- Dec 31, 2027
- ZIP
- 92683
David Leoni Construction
Tile contractor
- License
- B General Building / C-36 Plumbing / C-54 Tile · 742431
- Since
- 1997
- Expires
- Nov 30, 2027
- ZIP
- 92683
Dexterity Tile Solutions INC
Tile contractor
- License
- C-54 Tile · 1081348
- Since
- 2021
- Expires
- Feb 29, 2028
- ZIP
- 92683
Eddie Payne Kustom Tile
Tile contractor
- License
- C-54 Tile · 822656
- Since
- 2003
- Expires
- Aug 31, 2027
- ZIP
- 92683
Munoz Flooring
Tile contractor
- License
- C-54 Tile · 953250
- Since
- 2010
- Expires
- Oct 31, 2026
- ZIP
- 92683
New Gen Tile
Tile contractor
- License
- C-54 Tile · 1136009
- Since
- 2025
- Expires
- Apr 30, 2027
- ZIP
- 92683
Sherman Glenn Construction
Tile contractor
- License
- B General Building / C-54 Tile · 845147
- Since
- 2004
- Expires
- Aug 31, 2028
- ZIP
- 92683
Before you commit to a layout
- What are the exact interior dimensions of the shower once tile is on, not the framed opening before it?
- If it's curbless, how much will the subfloor be recessed, and does that affect the joists?
- If it's doorless, how much depth is planned to contain spray, and where does water exit toward the drain?
- Is the drain a point drain or a linear drain, and does that change the recess or slope plan?
- If glass is involved, is it framed or frameless, and is it tempered to meet the safety-glazing rule?
- Will grab bar blocking go in now even if a bar isn't mounted immediately?