Walk-In Shower Remodel, Westlake Village, California
Westlake Village, CA has 7 tile and shower pros carrying an active state license right now. Read our sizing and curbless-construction guides before you sit down with any of them.
Licenses checked · California Contractors State License Board
27.9%of residents are 65 or older
How long Westlake Village's walk-in shower pros have been at this
Westlake Village's earliest active listing on this page holds a license dating to 1989.
The typical Westlake Village listing has held that license for 22 years.
71% have kept the same license number for a decade or more.
Curbless framing rewards experience, since a bad slope or a mis-set recess isn't obvious until the tile is already down, so tenure in Westlake Village is worth a look.
7 shower and tile contractors based in Westlake Village
Listed A to Z by business name.
Asap Tile Stone & Painting Services
Tile contractor
- License
- C-54 Tile · 1131612
- Since
- 2025
- Expires
- Jan 31, 2027
- ZIP
- 91362
D K Tile
Tile contractor
- License
- C-54 Tile · 558929
- Since
- 1989
- Expires
- Mar 31, 2027
- ZIP
- 91362
Hanaman Builders Incorporated
Tile contractor
- License
- B General Building / C-54 Tile · 634002
- Since
- 1991
- Expires
- May 31, 2027
- ZIP
- 91362
Redm Tile & Slab
Tile contractor
- License
- C-54 Tile · 1148122
- Since
- 2025
- Expires
- Dec 31, 2027
- ZIP
- 91362
Reliable Floor Covering INC
Tile contractor
- License
- C-54 Tile · 839258
- Since
- 2004
- Expires
- May 31, 2028
- ZIP
- 91361
Textures By Stone
Tile contractor
- License
- B General Building / C-54 Tile · 995479
- Since
- 2014
- Expires
- May 31, 2027
- ZIP
- 91361
Tom French Ceramic Tile CO
Tile contractor
- License
- C-54 Tile · 561106
- Since
- 1989
- Expires
- Mar 31, 2027
- ZIP
- 91361
Before you commit to a layout
- What are the exact interior dimensions of the shower once tile is on, not the framed opening before it?
- If it's curbless, how much will the subfloor be recessed, and does that affect the joists?
- If it's doorless, how much depth is planned to contain spray, and where does water exit toward the drain?
- Is the drain a point drain or a linear drain, and does that change the recess or slope plan?
- If glass is involved, is it framed or frameless, and is it tempered to meet the safety-glazing rule?
- Will grab bar blocking go in now even if a bar isn't mounted immediately?